RBA Acoustics

Keybridge House Phase 2, London

Project Overview

Completed in 2021, Phase 2, Keybridge House is an exciting development located in Vauxhall which was granted planning permission for a mixed use development comprising a 19 storey tower formed of residential properties at second floor level and above.

In addition a two-form entry primary school will be located across floor levels -1 basement to first floor level, which is to form an extension of the existing Wyvil Primary School located across the road from the development site.

RBA was appointed to undertake the detailed design stage acoustic assessment of both the residential and school aspects of the Keybridge House Phase 2 development. This also includes a full assessment of the school acoustics to ensure BB93 compliance is achieved. As part of the assessment, a 3D environmental noise model was produced to aid the design of the external building fabric. In addition, multiple 3D acoustic models of the various teaching areas in the school were produced to aid the design of reverberation time noise control to ensure good speech intelligibility is achieved in these areas.

Project Details

Starting a project of your own?

Contact Us

Client

Mount Anvil

Architect

Allies & Morrison

Location

London

Contact RBA

Message RBA

Message RBA

We Use Cookies

We use cookies to help improve your experience on our website and to offer you the most relevant information.